To meet the future challenges of demand of electricity of Bangladesh at affordable cost with minimum environmental impact, the Company has drawn a long-term technology-oriented roadmap.
Future Projects
SN | Name of the Project | Fuel | Capacity (MW) | Expected COD | Status |
---|---|---|---|---|---|
1 | Payra 50 MW Wind Power Plant Project (Under JVC) | Wind | 50 | December 2022 | Details |
2 | Sirajganj 100 MW Grid Connected Photovoltaic Solar Power Plant Project (Under JVC) | Solar | 100 | June 2022 | Details |
3 | Jamuna 125 MW Grid Connected Photovoltaic Solar Power Plant Project (Under JVC) | Solar | 125 | December 2022 | Details |
4 | Dighipara 1000 MW Ultra Super Critical Thermal Power Plant Project (Under JVC) | Domestic Coal | 1000 | June 2028 | Details |
Total | 1275 |
Name of the Project:
Payra 50 MW Wind Power Plant Project (Under JVC)
Present Status:
- প্রকল্পের Feasibility Study M/s. FEDI, China কর্তৃক চলমান রয়েছে। বায়ু পরিমাপের জন্য 120 মিঃ Tower Erection, আনুষঙ্গিক যন্ত্রপাতি ও সেন্সর বসানোর কাজ সম্পন্ন হয়েছে এবং Data Collection and Analysis-এর কাজ চলছে।
Updated: Up to April 2020
Name of the Project:
Sirajganj 100 MWp Grid Connected Photovoltaic Solar Power Plant Project (Under JVC)
Present Status:
- প্রকল্পটি বাস্তবায়নের জন্য ‘বাংলাদেশ সেতু কর্তৃপক্ষ’-এর আওতাধীন বঙ্গবন্ধু সেতু সংলগ্ন ৩৩০ একর জমি ইজারা নেওয়ার প্রক্রিয়া চলমান রয়েছে। বর্তমানে ইজারা প্রস্তাবটি ভূমি মন্ত্রণালয়ে অনুমোদনের অপেক্ষাধীন রয়েছে।
- M/s. FEDI, China কর্তৃক প্রকল্পের Feasibility Study Report প্রস্তুত করা হয়েছে।
Updated: Up to April 2020
Name of the Project:
Jamuna 125 MW Grid Connected Photovoltaic Solar Power Plant Project (Under JVC)
Present Status:
- পরিকল্পনাধীন
Updated: Up to April 2020
Name of the Project:
Dighipara 1000 MW Ultra Super Critical Thermal Power Plant Project (Under JVC)
Present Status:
- পরিকল্পনাধীন